$150 Non-refundable Engineering Fee Required
at Sign-up
(Fee will be applied to total aid required
for job)
All additional fees will be billed after the job is staked.
Jobs requiring a Primary line extension, all Subdivisions,
Commercial services and Multi-family residential jobs will
be held in Engineering until all required fees have been
paid.
Residential service jobs will be released to Construction
after all required fees are received.
Primary Line Extensions
Costs
per Foot (Refundable)
Construction
Fee (Non-Ref) Overhead Underground
Single Phase $2,500.00 $5.25 $10.25
Three Phase $2,500.00 $14.25 $32.50
Single to Three
Phase Conversion $2,500.00 $9.25
(Ex: 300’ 1ph OH job [no secondary/service] would cost $2,500
+ $1,575 = $4,075)
Underground Residential Subdivisions
Single
Phase
Transformer $300.00
Each
Primary Wire $6.00
Foot
Secondary Wire $6.00 Foot
Developer paid Service Fee (per lot) $400.00
Lot
Consumer Paid Service Fee (per lot) $800.00
Lot
Service Extensions from Overhead Distribution
Single-family Residential Service
Underground Service 200
amp 400 amp
0-75 Feet $1,600.00 $1,800.00
75-125 Feet $1,800.00 $2,000.00
125-175 Feet $2,000.00 $2,200.00
175-250 Feet $2,500.00 $2,500.00
Overhead Service Single/Three
Phase
0-100 Feet $
1,400.00
100-175 Feet $
1,550.00
Multi-family Residential and Non-Residential Single/Three
Phase
200
Amp $1,700.00
400 Amp $1,900.00
600 Amp $2,100.00
800 Amp $2,300.00
Temporary Services
Temporary
Service Fee
Connect Consumer Service Wire $500.00
Install Transformer & Connect
Consumer Service Wire (Existing
Pole) $1,500.00
Install Pole(s), Transformer and
Connect Consumer Service
Wire Actual Estimated
Cost
of Job